AETEC
Robotic Spray Digital Twin
READY
LIVE CELL VIEW

Booth 3D digital twin

Drag to orbit Scroll to zoom
W 2.20 m L 3.00 m H 2.23 m
Sequence
  1. 01Load
  2. 02Side A
  3. 03Rotate
  4. 04Side B
  5. 05Unload
WET FILM THICKNESS

Coupon deposition map

Low High
0 μm50 μm100 μm150+ μm
CROSS-PASS SECTION

Profile & overlap

Gaussian
Combined build Individual passes
i

Current overlap is predicted to form a stable centre band. Edge allowance remains included in the cycle calculation.

CONCEPT P01

Automated booth layout

CUSTOMER INPUT + ENGINEERING ASSUMPTIONS

Requirement register

IDRequirementBasisStatus
R-01Existing booth: 2.20 m W × 3.00 m L × 2.23 m HEmailConfirmed
R-02Standard sample: 800 × 600 × 20 mm, maximum 500 gEmailConfirmed
R-03Spray both faces without removing sample from holderEmailConfirmed
R-04User-settable gun speed and spray overlap via HMI/PLCEmailConfirmed
R-0520 L paint tank; 20 samples completed within 4 hoursEmailConfirmed
R-0620-position mobile rack, no stacking, about 40 mm clearance, withstand 200°CEmailConfirmed
D-01Maximum takt to meet stated output: 12 minutes per completed sample20 pcs / 4 hDerived
D-02Ventilation, door and process permissives prevent spraying in an unsafe stateSafety conceptDerived
D-03Conductive frame and coupon grounding continuity monitored or verifiedSafety conceptDerived
V-01Paint chemistry, viscosity, solids, target wet/dry film and curing recipeSite visitVerify
V-02Existing booth airflow, extraction capacity, filter condition and available utilitiesSite visitVerify
V-03Hazardous-area classification and approved in-booth equipment requirementsSite visitVerify
V-04Hole locations/tolerances, masking zones, allowed hook contact marks and cleanliness criteriaSite visitVerify
V-05Rack path, booth door opening, loading side and upstream/downstream handlingSite visitVerify
Recipe ready 0%
ABOUT THIS MODEL

Engineering concept simulator

The digital twin estimates deposition by summing configurable cross-gun spray profiles along a serpentine robot path. It is intended for concept development, parameter comparison and site discussion.

Final equipment selection, hazardous-area compliance and coating recipe require qualified engineering review and physical testing.